Properties

Browse or get in touch to schedule a walkthrough.

  • Nearby me
Price range

Popular features

Community features

Association

Property features

Waterfront

View

Exterior Features

Interior Features

Style

10000 properties match your criteria

Updated 1 minute ago

E-Alert name

This beautiful brick home is nestled among the oaks and backs up to a natural area. Eat in kitchen with built in microwave and side by side refrigerator with ice and water in door (not warranted), wood burning fireplace in living room, enjoy the large formal dining room that could also be used as a den or media room and the master bedroom bay window and walk in closet. 2 car garage and an indoor laundry room. This home is not fenced. Sorry NO pets allowed. NO Smoking! Tenants are required to have renters insurance during the duration of their lease. Any person 18 years old or older must complete separate applications.
#788329

Niceville

1254 Whitewood Way

3 Beds

2 Baths

1,494 Sq.Ft.

$1,200

MLS#: 788329

Three consecutive lots available for sale, being Unit #'s 204, 205, and 206. Refer to the provided Plat in the Documents tab for reference.
#995448

Mary Esther

151 Mary Esther Boulevard 204

None Beds

None Baths

N/A

$185,000

MLS#: 995448

Available June 1, 2025. Call 850-830-5938. THIS PROPERTY IS TWO BLOCKS FROM THE BEACH and Pompano Joes! Two year lease. Ready to move into! Fully Furnished!! Large deck with separate storage building. Includes lot park model, deck and storage unit. Rent includes water, trash, and lawn maintenance. NO PETS! Listing agent has ownership interest in property. Listing Broker/Licensee related to owner.
#976096

Miramar Beach

50 W Bradley Street Lot 7

1 Beds

1 Baths

500 Sq.Ft.

$1,500

MLS#: 976096

COMPLETED APPLICATIONS ARE REQUIRED FOR EACH ADULT BEING ACCEPTED AND PROCESSED ON A FIRST COME, FIRST SERVE BASIS. SMOKING PROHIBITED.
THIS IS AN END UNIT TOWNHOME WITH NEW KITCHEN CABINETS, NEW APPLIANCES, NEW FLOORING IN THE BATHROOM. THE 1ST FLOOR FEATURES KITCHEN WITH BREAKFAST BAR, FAMILY ROOM, 1/2 BATHROOM, INSIDE LAUNDRY ROOM, STORAGE SHED. THE 2ND FLOOR HAS 2 BEDROOMS AND A FULL BATHROOM. PRIVACY FENCED BACK YARD.
FOR MORE INFORMATION, TO SCHEDULE AN APPOINTMENT TO VIEW THIS TOWNHOME, PLEASE VISIT OUR WEBSITE AT WWW.PROPERTYFRAMEWORKS.COM/PENSACOLA
#763591

Fort Walton Beach

417 NW HOLLYWOOD Boulevard

2 Beds

2 Baths

1,156 Sq.Ft.

$875

MLS#: 763591

4 bedroom 2 bath.  Nice size lot.  Large open Concept Kitchen and Living Room.  Double Tray Ceiling in Living Room area.  Kitchen is open to living area showing the   Beautiful Cabinetry work with Granite Counter tops. Large pantry for storage. Soft close drawers.  Stainless Steel appliances.  Tray Ceiling in Master Bedroom. Double vanity in master bath.  Lots of closet space.  Fenced in back yard.
#864100

Crestview

240 Dixie Street

4 Beds

2 Baths

1,522 Sq.Ft.

$1,650

MLS#: 864100

AVAILABLE... August 2, 2023. This RARE, WATERFRONT 5bd/3bth home is located in the Villages of Mill Bayou! Just over 3,000 sq ft, this home offers split Bedroom floorplan, with Formal Dining & Office/Flex Space just as you enter the home. Featuring all new wood flooring throughout, this home offers a great open concept with its huge Family Room & Kitchen in the heart of the home. Stainless steel appliances are included, along with granite countertops & large kitchen island! Master Bedroom is its own retreat, located just off the Family Room with its double-vanity ensuite Bathroom, complete with garden tub/shower. Enjoy the catch & release pond! Community POOL!! NO smoking. Pets allowed upon approval with a non-refundable pet fee. Minimum 600 FICO credit score required.
#925180

Panama City

103 S Shoreview Drive

5 Beds

3 Baths

2,927 Sq.Ft.

$3,200

MLS#: 925180

Available 7/08/2016...Conveniently located with easy access to Special Forces Compound, Duke and Eglin AFB, beaches and shopping. South Crestview home lives large, featuring 3/2 floor plan with many upgrades. Galley kitchen, dining area and large living room. Upgraded lighting, ceramic tile in the main living areas, and plenty of natural light. Master bedroom features crown molding, large walk in closet & plenty of room for the furniture. Master bath boasts a garden tub & large vanity. This home is perfect for outdoor entertaining. HUGE screened back patio features ceiling fans and a cable ready outlet. The pet even has an entrance and exit. The large level corner lot has a privacy fenced back yard and arbor. This home is pet friendly. Single car garage. No inside smoking. Pet fee $400.
#753961

Crestview

130 WILD HORSE Drive

3 Beds

2 Baths

1,116 Sq.Ft.

$995

MLS#: 753961

Fast developing area of North Santa Rosa Beach 
Lot is very close to the 10,000 seat Amphitheatre that the county has planned.  Public water and sewer are available in the area.  

No Homeowner's Association.

Great investment to build or buy and hold!
#899745

Santa Rosa Beach

XXX Fourth Street Lot #13

None Beds

None Baths

0.14 acres

$50,000

MLS#: 899745

This 3 bed 2 bath home is conveniently located close to shops, schools, beaches, and bases. When you enter the home you will notice the large living room with a cathedral ceiling, gas log fireplace, and built in shelving. Split floor plan, the guest rooms are off the living room and the master is off the kitchen area. As you cross the living room you will find the kitchen and dining room area that has an exit to the covered patio and fenced in yard.  Roof was replaced in 2017 and there is a 15 kW 60 Hz GUARDIAN PLUS AIR-COOLED HOME GENERATOR by Generac
#910501

Fort Walton Beach

630 Jerrells Avenue

3 Beds

2 Baths

1,612 Sq.Ft.

$2,300

MLS#: 910501

Available 03/05/2018...This 3/2 home lives large. Spacious living in all areas of the home featuring plenty of cabinets, counter top space, breakfast bar, walk in closets, treyed ceilings, huge bedrooms and much more. Back yard is great for entertaining on the deck with large back yard that is pet friendly. Easy access to 90 and 85 for commute to bases, beaches and shopping. 35 minutes to Eglin. Home is located on a cul de sac with plenty of privacy. No inside smoking. Pets allowed with a non-refundable $400 pet fee and owner approval.
#791375

Crestview

3417 Skymaster Court

3 Beds

2 Baths

1,569 Sq.Ft.

$995

MLS#: 791375

One of the most sought after neighborhoods just off Scenic 30-A. Walk or bicycle to the public beach access. Santa Rosa Golf Club is just across the road. The Courtyards is a 44 home community with a community pool! The courtyard at the front of the home makes a welcoming statement. The living room is large enough to entertain a large party or family gathering. Open concept dining area has French doors leading out to the large, enclosed screened porch with a stone floor. Featuring two bedrooms and two and a half baths on the first floor and the third bedroom/office/studio and bath on the second level.
#846483

Santa Rosa Beach

148 Courtyard Drive

3 Beds

3 Baths

1,876 Sq.Ft.

$3,200

MLS#: 846483

This is an adorable 3-bedroom 2 bath home has a great Cottage feel with a large front porch area for relaxing and visiting. This home boosts an open concept space when you enter the home. The modern kitchen is open and airy and features granite countertops, a large pantry, beautiful kitchen backslash and an island for cooking while enjoying the family or guests nearby in the big open living and dining space. The master bedroom has a large bathroom and a large walk in closet. The 2nd and 3rd bedrooms also have large closets, ceiling fans & blinds. All flooring is the LVP!
Fully fenced back yard with side and back porches for an added touch of outdoor enjoyment. Home sits above the ground and has a crawl space.
#949821

Santa Rosa Beach

144 Central 7Th Street

3 Beds

2 Baths

1,200 Sq.Ft.

$2,350

MLS#: 949821

Finally a place to build your Dream Get-a-Way Home. Welcome to By The Sea, a beautiful gated community just steps to the Beach. By The Sea offers a Deeded Sound access, a pool, bath house, fire pit, hot tub and low HOA fees of only 300.00 per quarter. A nice opportunity that may not last long.
#828914

Navarre

1A Seaside Circle

None Beds

None Baths

0.07 acres

$120,000

MLS#: 828914

CERAMIC TILE FLOORS IN KITCHEN, FOYER, AND BOTH BATHROOMS. VERY LARGE INTERIOR UTILITY ROOM WITH EXTRA SPACE FOR STORAGE. DOWNSTAIRS UNITS HAVE NICE PATIO AREA. MUST SEE! AVAILABLE JULY 27.
#777749

Fort Walton Beach

895 Silverwood Court 2

2 Beds

2 Baths

960 Sq.Ft.

$900

MLS#: 777749

This lot is over half an acre! This is 1 of 5 lots available. Perfect for your new Home or manufactured home! Close to Downtown DeFuniak Springs and the Historic District. Only 35 minutes to the beaches of South Walton. All measurements to be verified by buyer.
#906242

DeFuniak Springs

.66 Ac +/- Trainer Court

None Beds

None Baths

0.66 acres

$15,000

MLS#: 906242

1 ... 160 161 162 163 164 ... 666
* Listings identified with the FMLS IDX logo come from FMLS and are held by brokerage firms other than the owner of this website. The listing brokerage is identified in any listing details. Information is deemed reliable but is not guaranteed. If you believe any FMLS listing contains material that infringes your copyrighted work please click here to review our DMCA policy and learn how to submit a takedown request. © 2024. First Multiple Listing Service, Inc.
 - property

Send a message

Message successfully sent.

Your message

What is 3 + 4 ?

Reason for contacting?

I agree to receive email communication and understand I can unsubscribe at any time.

I agree to be contacted by Coastal Vibes Luxury Beach Group via call, email, and text for real estate services. To opt out, you can reply 'stop' at any time or reply 'help' for assistance. You can also click the unsubscribe link in the emails. Message and data rates may apply. Message frequency may vary. Privacy Policy

Sign Out

Virtual Assistant

Would you like to take the next step with this property? We can help you schedule a showing or virtual tour, or send you more details.

Yes, I would like more information.

Thank You for Your Reply, One of Our Agents will contact you as soon as possible

No, maybe later.

Thank you, you can always contact me via email, phone number or through the contact form.

Realhub AI

Lucy - Your AI-Powered Realtor

Update Your Temporary Password

Personalize your search

Enter your email and we'll notify you immediately when new listings match what you're looking for.

or enter email address

Already have an account ? Login here

Continue your home search

I agree to receive communications and understand I can unsubscribe at any time.

I agree to be contacted by Coastal Vibes Luxury Beach Group via call, email, and text for real estate services. To opt out, you can reply 'stop' at any time or reply 'help' for assistance. You can also click the unsubscribe link in the emails. Message and data rates may apply. Message frequency may vary. Privacy Policy

Already have an account ? Login here

We use cookies

We use cookies primarily for analytics to enhance your experience. By accepting, you agree to our use of these cookies. You can manage your preferences or learn more about our cookies policy.